Audit what Phases 0–8 built. Deliberately narrow: §19/§20 (XCUT/NFR) only — it does not re-litigate every
open judgment call that happens to say "Phase 9" somewhere.
Scope
- Per-ID disposition table for all 24
XCUT IDs and all 17 NFR IDs (the first systematic tabulation of the
XCUT family — only two incidental citations existed across every prior spec/plan).
@dexpace/shrink-test — private, unpublished devDependency closing NFR-9: esbuild bundle/minify/tree-shake
step, a dual-package-hazard fixture app, and a child-process round-trip guard wired into the default build as
bun run shrink-test.
tests/conformance/xcut/ — a top-level integration suite driving 5c/7b's standardResilience() composed
pipeline (fixtures/composed-pipeline.ts).
NFR-13 SPDX-header sweep across every package — several phase plans carry no header instruction.
Spec refs
Product spec §19, §20, appendix B.
Dependencies
Phases 0–8b (audits them all).
Docs
- Design:
docs/superpowers/specs/2026-07-28-phase9-cross-cutting-conformance-design.md
- Plan:
docs/superpowers/plans/2026-07-28-phase9-cross-cutting-conformance.md
- Validation prompt:
docs/validation-prompts/phase9-cross-cutting-conformance-validation-prompt.md
Explicitly not in scope
PAGE/SSE/SERDE disposition stays with 6c/6b/6a. RECOV-* disposition stays with 5a. AUTH-*/REDIR-*
interpretive calls and preset-shape questions belong to Phase 10.
Audit what Phases 0–8 built. Deliberately narrow:
§19/§20(XCUT/NFR) only — it does not re-litigate everyopen judgment call that happens to say "Phase 9" somewhere.
Scope
XCUTIDs and all 17NFRIDs (the first systematic tabulation of theXCUTfamily — only two incidental citations existed across every prior spec/plan).@dexpace/shrink-test— private, unpublished devDependency closingNFR-9: esbuild bundle/minify/tree-shakestep, a dual-package-hazard fixture app, and a child-process round-trip guard wired into the default build as
bun run shrink-test.tests/conformance/xcut/— a top-level integration suite driving 5c/7b'sstandardResilience()composedpipeline (
fixtures/composed-pipeline.ts).NFR-13SPDX-header sweep across every package — several phase plans carry no header instruction.Spec refs
Product spec §19, §20, appendix B.
Dependencies
Phases 0–8b (audits them all).
Docs
docs/superpowers/specs/2026-07-28-phase9-cross-cutting-conformance-design.mddocs/superpowers/plans/2026-07-28-phase9-cross-cutting-conformance.mddocs/validation-prompts/phase9-cross-cutting-conformance-validation-prompt.mdExplicitly not in scope
PAGE/SSE/SERDEdisposition stays with 6c/6b/6a.RECOV-*disposition stays with 5a.AUTH-*/REDIR-*interpretive calls and preset-shape questions belong to Phase 10.